| Situation | Problem with one standard unit | Better fit |
|---|---|---|
| Crew over 20 on one site | Below the OSHA ratio; fills fast | 2 or more units, or extra weekly service |
| Public visitors or a worker who uses a wheelchair | Narrow door, raised floor | ADA porta potty, $215 per cycle |
| Model home or client walkthroughs | Basic look, no sink | Deluxe flushing unit, $275 per cycle |
| Food truck or lunch area on site | No place to wash hands | Add a hand-wash station, $140 per cycle |
| No truck path within 30 feet | The dolly cannot reach the spot | Pick a closer spot before delivery |
Construction Porta Potty Rental in Boise, ID
Construction porta potty rental in Boise with weekly service, OSHA-ready counts, and billing that stops when you call.
Reviewed by Danielle, owner · Updated

The 5 answers you need before you call
Boise · 30 towns · 10 counties- Delivery area
- Same-day across the Boise metro when you call before noon, for a $95 rush fee. Outer towns get same-day or next morning.
- When it arrives
- The driver sets the unit on firm ground within 30 feet of the truck. The path needs a 48-inch opening.
- Which unit
- PolyJohn PJN3 class: toilet, urinal, 60-gallon tank, no sink. Add a hand-wash station for $140 a cycle.
- Cleaning
- One visit every week: pump-out, wash-down, sanitize, and a paper restock.
- Full cost
- $165 per 28-day cycle, plus a one-time $75 delivery and pickup in Zone 1. No deposit.
6 AM–8 PM MT
How many construction porta potties does OSHA require for a Boise crew?
OSHA rule 29 CFR 1926.51(c) sets the jobsite minimum. A crew of 20 or fewer workers needs 1 toilet. Above 20 workers, the rule calls for 1 toilet seat and 1 urinal per 40 workers. Above 200 workers, the ratio drops to 1 seat and 1 urinal per 50. Idaho uses federal OSHA, so this table applies here.
| Workers on site | OSHA Table D-1 minimum | What we suggest |
|---|---|---|
| 1–10 | 1 toilet | 1 standard unit, weekly service |
| 11–20 | 1 toilet | 1 unit with a second weekly service, or 2 units |
| 21–40 | 1 toilet seat and 1 urinal | 2 standard units |
| 41–80 | 2 seats and 2 urinals | 3–4 standard units |
| 81–120 | 3 seats and 3 urinals | 4–5 units plus extra service |
| 200 or more | 1 seat and 1 urinal per 50 workers | Quote from your site plan |
Each PolyJohn PJN3 class unit has both a seat and a urinal. Our suggestions run above the minimum because a full tank is the top cause of jobsite complaints. Read the full rule text on the OSHA 1926.51 page.
Idaho has no state OSHA plan. The federal OSHA Boise Area Office covers private employers. Section 1926.51(f) also asks for a place to wash hands, which a two-sink hand-wash station covers.
Units used only by construction workers are exempt from ADA rules under section 203.2. Our guide to OSHA toilet rules in Idaho covers the edge cases, like mobile crews.

What does the 28-day billing cycle include?
One 28-day cycle for a standard construction unit costs $165. That cycle price includes 1 service visit every week: pump-out, wash-down, sanitizing, and a toilet paper restock. Delivery and pickup is a one-time $75 charge in Zone 1. There is no deposit, no fuel surcharge, and no card fee.
| Unit | Per 28-day cycle | Weekly service | Delivery + pickup (Zone 1) |
|---|---|---|---|
| Standard porta potty | $165 | Included | $75 one time |
| ADA wheelchair-accessible unit | $215 | Included | $75 one time |
| Deluxe flushing unit with sink | $275 | Included | $75 one time |
| 2-station hand-wash station | $140 | Included, with water refill | $75 one time |
Zone 1 covers Boise, Garden City, Meridian, Eagle, Kuna, Star, Nampa, and Hidden Springs. Sites in Zone 2 add $45, and Zone 3 adds $85. An unscheduled extra service costs $65, and 6% Idaho sales tax applies.
Approved contractor accounts can pay by invoice, Net 15. See the monthly porta potty rental page for long-term terms.
Short jobs: 3 days to 4 weeks
A roofing tear-off or a two-week framing push pays one 28-day cycle. Weekly service is still part of that cycle. For example, a standard unit on a 10-day job comes to $165 plus $75, before tax.

Get an itemized price in one short call.
What happens from booking to pickup on a jobsite?
A jobsite rental moves through 6 steps, from booking to the final pickup. Booking takes a few minutes by card or contractor account. In the Boise metro, a call before noon can mean same-day delivery. Billing stops once you call or text for pickup, and pickup happens within 2 business days.
- Book. Give the site address, a gate code, and a site contact. On a new lot, a road name and a map pin work fine.
- Pick the spot. The truck must get within about 30 feet on firm ground. A standard unit is 44 to 47 inches wide, so it needs a 48-inch opening.
- Delivery. Mark the spot with paint, a stake, or a photo. Face the door away from the street if neighbors are close.
- Weekly service. The service truck needs the same clear path each week. Move pallets and trailers off that path on service day.
- Extensions. The rental rolls into the next 28-day cycle on its own. There is no new paperwork and no long-term contract.
- Stop billing. Call or text for pickup at any time. No new 28-day cycle is billed after that request.
Street placement and ACHD
The Ada County Highway District controls streets, sidewalks, and shoulders across Ada County. A unit in the right-of-way needs an ACHD Temporary Use Permit, and review takes up to 5 working days. A driveway or a fenced lot needs no ACHD permit.

Which unit fits a remodel, framing, or roofing crew?
A standard PolyJohn PJN3 class unit fits most crews of 1 to 10 workers. The PJN3 stands 91 inches tall, 43.5 inches wide, and 47 inches deep. The PJN3 weighs 165 pounds and holds 60 gallons. Remodel crews usually place the unit in the driveway, because the unit will not pass a 36-inch side gate.
| Model | Size (H x W x D) | Weight | Tank | Use on site |
|---|---|---|---|---|
| PolyJohn PJN3 | 91" x 43.5" x 47" | 165 lb | 60 gal | Standard crew unit, toilet and urinal |
| Satellite Maxim 3000 | 90" x 44" x 48" | 189 lb | 70 gal | Same class, larger tank |
| PolyJohn Bravo | 62" x 26.5" x 21.5" | 70 lb empty | 22 gal fresh | Two-sink hand washing, foot pumps |
Home remodel crews
A kitchen or bath remodel often shuts off the house toilet for weeks. A driveway spot by the garage keeps workers out of the home. Homeowners like the door facing the house, away from the street.
Framing crews
Framing crews in new subdivisions move from lot to lot fast. One unit at the lot with the best truck access can serve a small crew. Ask for a move when the crew shifts more than a short walk away.
Roofing crews
Keep the unit clear of the zone where tear-off debris lands. A cracked roof or a tipped unit is billed at repair cost. A short roofing job still pays only one 28-day cycle.

How do Boise summers and winters change jobsite service?
Boise averages about 55 days a year at 90°F or hotter, and July highs average 92.7°F. Summer heat raises odor and fills tanks faster on large crews. From November through March, we add antifreeze to every tank at no charge. Hand-wash water can freeze below 32°F, so winter sites may need sanitizer.
| Season | What changes | What to plan |
|---|---|---|
| June–September | Heat speeds up odor and tank use | Shaded spot; a second weekly service for crews over 10 |
| November–March | Tanks and sink water can freeze | Antifreeze included; sanitizer in place of water sinks |
| Snow days | Service truck needs a path | Clear a lane to the unit before service day |
Boise's record low is −28°F, and January lows average 25.5°F. Read our winter porta potty guide for Idaho before a cold-season start.

When is a standard jobsite unit the wrong choice?
A standard jobsite unit is the wrong choice in about 5 situations. A crew over 20 needs more units or more service. A site open to the public may need an ADA unit. Client walkthroughs may call for a flushing unit. A lunch area needs hand washing, and a spot beyond 30 feet needs a new plan.
Questions renters ask about this
Is the price the same whether I keep it three days or a full month?
One 28-day cycle covers any job from 3 days to 4 weeks. A standard unit costs $165 for that cycle, and weekly service is part of it. The $75 delivery and pickup charge in Zone 1 is paid once, not every cycle.
How often does it get cleaned?
Every construction rental gets 1 service visit per week. The tech pumps the tank, washes the unit down, sanitizes the surfaces, and restocks toilet paper. Crews over 10 can add a second weekly visit, and an unscheduled extra service costs $65.
Our current company never cleans the one we have. Can you swap it out?
We can drop a fresh unit on the day you choose. Ask your old vendor to pick theirs up the same week. Our weekly visit covers a pump-out, wash-down, sanitizing, and a paper restock. Your crew is not left with a full tank.
We don't have a full address yet, just the road name. Is that okay?
A road name plus a map pin or the nearest cross street works for a new lot. Tell us which side of the road and any landmark, like a lot stake or a dumpster. A photo of the spot helps the driver find it on the first trip.
We're a painting contractor at a residential home. Is that construction?
OSHA's construction rules cover alteration and repair work, and that includes painting. For a rental, a paint crew gets the same 28-day setup as any other crew. A small crew of 1 to 10 painters needs 1 standard unit with weekly service.
There are about three guys working here. Is one standard unit enough?
One standard unit meets OSHA's minimum for any crew of 20 or fewer. For a crew of three, weekly service keeps the tank well below full. Add a hand-wash station if the crew eats lunch on site.
Can I pay by invoice with a contractor account?
Approved contractor accounts can pay by invoice on Net 15 terms. Everyone else pays by card at booking with Visa, Mastercard, Amex, or Discover. There is no deposit and no card fee.
Next useful answers
Official sources: OSHA 29 CFR 1926.51 sanitation rule · ACHD right-of-way permits
Book your porta potty in one call
(208) 240-9888Tell us the address, dates and head count. You get one itemized price on the spot, and the unit can be on site today.
Prefer to type? Send the form and we call you back within 30 minutes during business hours.
⏱ Same-day cutoff: 12:00 PM MT